Controlled load is a separate appliance arrangement
With controlled load, eligible equipment is supplied through a separately arranged circuit and its usage is measured separately for the applicable tariff. The circuit may only be energised during defined periods. Storage hot water is a common example, while other appliances depend on network and retailer eligibility.
A separate measurement does not necessarily mean a second physical meter box: an appropriate metering installation may record more than one element. The physical configuration must be confirmed by the appointed provider and electrician. Setting a timer on an ordinary socket does not create controlled load or make the usage eligible for its rate.