Smart MeterAustralia
Call
Meter Relocations Sydney

METER RELOCATIONS

Renovating, extending or subdividing? Your electricity meter may need to move to a compliant, accessible location. We handle the switchboard works, wiring, network requirements and metering coordination so your meter relocation does not hold up your build.

CALL 0466 125 125
Electricity meter relocation by Sydney Level 2 electricians
Map of AustraliaAustralian Owned & Operated
NSW Level 2 ASP
Licensed Electricians
Fully Insured
AS/NZS 3000 Compliant Work
Ausgrid Service Area
Endeavour Energy Service Area
Essential Energy Service Area
Residential, Commercial and Strata

Work completed in accordance with applicable NSW network, metering and electrical requirements.

WHY CHOOSE US FOR Meter Relocations

  • Relocations for renovations, extensions and new builds
  • New metering position compliant with network standards
  • Switchboard and consumer mains works completed in-house
  • Coordinated with your builder’s timeline

When a meter needs to move

Common reasons include a wall being demolished or built over, a garage conversion, subdividing a block, or a meter that is currently inaccessible to meter readers and emergency services. Networks require meters to be in accessible, protected locations — and non-compliant positions attract defect notices.

How we manage the relocation

We plan the new metering position to meet distributor requirements, install the new board or enclosure, run the necessary wiring, and coordinate the meter exchange or transfer with your retailer. Where the relocation coincides with a renovation, we schedule around your builder to avoid delays.

Meter Relocations FAQS

Can I move my meter inside a garage or fence line?

Meters must remain accessible to your network distributor and metering provider. We advise on compliant options — including reading windows and approved enclosures — for your specific site.

How long does a meter relocation take?

The physical works usually take one day. Total time depends on retailer scheduling for the meter transfer, which we coordinate on your behalf.

REQUEST A QUOTE

Fill out the form below and our team will get back to you fast.

Photos (switchboard or defect notice, optional)