How to Move an Electricity Meter (Renovating? Read This First)

Meters end up in the way of renovations all the time. Moving one is straightforward — if you plan it before the builder needs the wall.

How to Move an Electricity Meter (Renovating? Read This First)
Map of AustraliaAustralian Owned & Operated
NSW Level 2 ASP
Licensed Electricians
Fully Insured
AS/NZS 3000 Compliant Work
Ausgrid Service Area
Endeavour Energy Service Area
Essential Energy Service Area
Residential, Commercial and Strata

Work completed in accordance with applicable NSW network, metering and electrical requirements.

The Problem: The Meter Is Where the Extension Goes

Renovations regularly collide with the meter box: the wall it sits on is being demolished, the new garage swallows it, or a facade upgrade wants it gone from the front of the house. Builders can’t touch it, and leaving it until frames are up turns a routine job into a schedule-breaking emergency.

A meter relocation involves the service connection and metering — network-side work that neither your builder nor a general electrician is authorised to perform.

The Solution: Book the Relocation Into the Build Program

A relocation moves the meter box, re-runs the consumer mains to the new position and re-terminates the service — with the network notified and the metering re-registered. As a Level 2 ASP on all three Sydney networks, we do the whole scope, including any switchboard work the new position needs.

The key is timing: involve us at the planning stage and the relocation slots neatly between demolition and framing, often paired with a switchboard upgrade since the board is being rebuilt anyway.

The Result: The Build Proceeds on Schedule

The meter ends up in a compliant, accessible position that suits the finished home, the builder keeps their program, and you avoid paying trades to stand around waiting for power work.

Renovating this year? Call 0466 125 125 with your plans and we’ll tell you if the meter needs to move and when to schedule it.

COMMON QUESTIONS

Where is the meter allowed to go?

Network rules require safe, unobstructed access for reading and maintenance — generally on an external wall near the point of supply. We confirm a compliant position as part of the quote.

Will the power be off during the relocation?

Yes, for the duration of the changeover — typically part of one day. We coordinate the outage window with your builder so other trades can plan around it.