Once a commercial supply gets big enough, ordinary meters can’t carry the current — that’s where CT metering comes in.

CT Metering for Commercial Buildings, Explained Simply
Map of AustraliaAustralian Owned & Operated
NSW Level 2 ASP
Licensed Electricians
Fully Insured
AS/NZS 3000 Compliant Work
Ausgrid Service Area
Endeavour Energy Service Area
Essential Energy Service Area
Residential, Commercial and Strata

Work completed in accordance with applicable NSW network, metering and electrical requirements.

The Problem: Supplies Too Big for Ordinary Meters

Standard “whole current” meters pass the full supply current through the meter itself, which works up to around 100 amps per phase. Larger commercial premises — warehouses, big retail, manufacturing, major fit-outs — draw far more than that, and fitting the wrong metering class stalls the connection application entirely.

This trips up businesses at the worst time: mid fit-out, with a network application rejected or an energisation on hold over metering requirements they’ve never heard of.

The Solution: Current Transformer (CT) Metering

CT metering measures indirectly: current transformers clamp around the main conductors and feed a scaled-down signal to the meter, which multiplies it back out. The result is accurate interval metering on supplies of practically any size, with the CTs, test links and meter installed to the network’s metering standards.

Designing and installing CT metering is specialist Level 2 work — CT sizing, wiring and commissioning must all satisfy the network. We deliver CT metering for commercial and industrial sites across Sydney, coordinating with your electrician, the network and the retailer.

The Result: A Compliant Connection at Full Capacity

With CT metering commissioned, the site is billed accurately on interval data at whatever capacity the business needs, and the connection paperwork clears without metering objections.

Planning a fit-out or upgrade with serious load? Call 0466 125 125 early — metering class is much cheaper to get right on paper than to redo in the switchroom.

COMMON QUESTIONS

How do I know if my site needs CT metering?

It’s driven by the supply size — broadly, supplies beyond the whole-current range (around 100A per phase) require CT metering. Your connection application and load schedule determine it; we can assess this from your electrical plans.

Can tenancies within a building have their own CT meters?

Yes — larger tenancies can be individually CT-metered, and smaller ones whole-current metered, within the same building. Tenancy metering design is part of what we scope.

NEED THIS SORTED?

Level 2 ASP accredited on Ausgrid, Endeavour Energy and Essential Energy. Free quotes, honest advice.

CALL 0466 125 125