The Problem: Finished House, No Power
It’s a familiar story: the build is at practical completion, the certifier is booked, and the site is still on temporary supply because the meter installation is lost between the network application, the retailer account and the metering coordinator. Every week of delay pushes settlement and costs someone money.
The cause is almost always sequencing — metering treated as a final-week detail instead of a milestone with its own lead times.